Before We Arrive

Before We Arrive

For a successful, safe and cost effective pour, we require prior information to ensure everything runs smoothly.

Please will you provide us with the following details before the pour:

  • The type of concrete required
  • The quantity of concrete needed
  • The size of pump required
  • Whether we will be supplying the concrete or you have your own supplier
  • The distance from where the pump will be set up to the furthest point away
  • The date and time the pump is required – allowing for set up and clear up afterwards
  • Site details and special requirements

Our team of friendly staff are available to do a site survey and advise you on any of the above details.

 
 

We follow strict Health and Safety guidelines, and the safety of all personnel is paramount, so please follow these guidelines prior to our arrival:

  • Our trucks need clear access to the pump area
  • The hard standing area must be strong enough to support the concrete pumps and outriggers
  • Please ensure there are no overhead obstructions, if so please inform us
  • We may need access to water throughout the pump process
  • For Line pumps: please provide 1 bag of cement per 20 meters of pipeline
  • For Boom pumps: Please provide 1 bag of cement for boom pump and 1 bag of cement per extra 20 meters of pipeline.
  • Please protect the surrounding area and provide polythene to prevent spillages
  • Please provide a wheelbarrow and suitable washout area

Contact Us

Please phone Chiltern Concrete Pumping today to book your concrete pump. We are competitively priced and highly experienced.